← BACK TO WORK

PROJECT / FIELD WORK

Host-based data loader.

Aircraft mission setup, reduced from around 45 minutes to under five.

STACK

Systems, Automation, Data workflows

STATUS

FIELD WORK

Built at Hindustan Aeronautics Limited. Improved a host-based data loading workflow used in aircraft mission setup.