PROJECT / FIELD WORK
Host-based data loader.
Aircraft mission setup, reduced from around 45 minutes to under five.
STACK
Systems, Automation, Data workflows
STATUS
FIELD WORK
Built at Hindustan Aeronautics Limited. Improved a host-based data loading workflow used in aircraft mission setup.